Faculty of Architecture, Civil Engineering and Geodesy, University of Banja Luka , Banja Luka , Bosnia and Herzegovina
Faculty of Architecture, Civil Engineering and Geodesy, University of Banja Luka , Banja Luka , Bosnia and Herzegovina
Construction Center ‘Centar’ Ltd. , Banja Luka , Bosnia and Herzegovina
The process of building the Faculty of Architecture, Civil Engineering and Geodesy, University of Banja Luka began in 2008 with the preparation of the necessary technical documentation. This implied a selection of the winning competition design solutions, Preliminary and Final project and obtaining the necessary permits and approvals. The first phase of construction began in late 2012 and includeed construction of basic structural system, without making final elements of the outer layer, flat roof, internal processing, installation systems and installation of equipment and machinery. This paper provides an overview of the preparation and development of investment ‐ technical documentation and course of the construction of the facility.
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
The statements, opinions and data contained in the journal are solely those of the individual authors and contributors and not of the publisher and the editor(s). We stay neutral with regard to jurisdictional claims in published maps and institutional affiliations.