A REVIEW OF TECHNIQUES AND METHODS FOR PROJECT PLANNING AND REPLANNING IN CONSTRUCTION

By
Milenko Stanković ,
Milenko Stanković
Contact Milenko Stanković

Faculty of Architecture, Civil Engineering and Geodesy, University of Banja Luka , Banja Luka , Bosnia and Herzegovina

Goran Ćirović ,
Goran Ćirović

Faculty of Architecture, Civil Engineering and Geodesy, University of Banja Luka , Banja Luka , Bosnia and Herzegovina

Snežana Mitrović ,
Snežana Mitrović

HIGH SCHOOL OF CIVIL ENGINEERING AND GEODETICS BELGRADE , Belgrade , Serbia

Nataša Popović‐Miletić
Nataša Popović‐Miletić

Faculty of Architecture, Civil Engineering and Geodesy, University of Banja Luka , Banja Luka , Bosnia and Herzegovina

Abstract

Project scheduling methodology has been studied widely, and various tools have been developed for accurate scheduling. In this paper an analysis of the techniques and methods for project planning and re‐planning in construction is presented. A comparison was made among CPM and CCM methods, PERT and other probabilistic methods and necessary conditions to apply each of these techniques were determined. Traditional network scheduling techniques, CPM and PERT have been widely applied for the past decades. However, schedule delays often occur in many construction projects. A multitude of reasons affect the success of a project and unrealistic schedules is often the main reason for project failure.